Planning, Scheduling & Programming Discussion Member for 21 years 8 months Member for 21 years 8 months Submitted by Rafael Davila on Wed, 2015-04-15 13:52 Permalink You must differntiate You must differntiate structure type, a post-tensioned structure is not the same as a flat slab or concrete joist slab. http://concreteconstruction.net/Images/Reshoring%20of%20Multistory%20Co… http://www.concrete.org/Portals/0/Files/PDF/Previews/347205_2pager.pdf https://ardiansyahnegara.files.wordpress.com/2010/01/ch8_construction-l… http://eprints.qut.edu.au/4051/1/4051_1.pdf Log in or register to post comments
Member for 21 years 8 months Member for 21 years 8 months Submitted by Rafael Davila on Wed, 2015-04-15 13:52 Permalink You must differntiate You must differntiate structure type, a post-tensioned structure is not the same as a flat slab or concrete joist slab. http://concreteconstruction.net/Images/Reshoring%20of%20Multistory%20Co… http://www.concrete.org/Portals/0/Files/PDF/Previews/347205_2pager.pdf https://ardiansyahnegara.files.wordpress.com/2010/01/ch8_construction-l… http://eprints.qut.edu.au/4051/1/4051_1.pdf
Member for
21 years 8 monthsYou must differntiate
You must differntiate structure type, a post-tensioned structure is not the same as a flat slab or concrete joist slab.
http://concreteconstruction.net/Images/Reshoring%20of%20Multistory%20Co…
http://www.concrete.org/Portals/0/Files/PDF/Previews/347205_2pager.pdf
https://ardiansyahnegara.files.wordpress.com/2010/01/ch8_construction-l…
http://eprints.qut.edu.au/4051/1/4051_1.pdf