Construction activity scheduling for School Building

Member for

11 years 7 months

I THINK IT MAY OUT DATE.

But someone can help this post...........

here r some activites.............

Activity NameOriginal DurationCity Center Office Building Addition681  Design and Engineering107    Design Building Addition55    Start Office Building Addition Project0    Review and Approve Designs22    Assemble Technical Data for Heat Pump7    Review Technical Data on Heat Pumps27  Foundation146    Begin Building Construction0    Site Preparation43    Excavation24    Install Underground Water Lines12    Install Underground Electric Conduit12    Form/Pour Concrete Footings24    Concrete Foundation Walls24    Form and Pour Slab12    Backfill and Compact Walls5    Foundation Phase Complete0  Structure151    Erect Structural Frame48    Begin Structural Phase0    Floor Decking34    Concrete First Floor36    Erect Stairwell and Elevator Walls24    Concrete Basement Slab24    Concrete Second Floor36    Structure Complete0  Mechanical/Electrical Systems562    Rough-In Phase Begins0    Rough In Complete0    Elevator218      Install Elevator Rails and Equipment3      Install Elevator Cab and Finishes5    HVAC562      Prepare and Solicit Bids for Heat Pump15      Review Bids for Heat Pump10      Award Contract for Heat Pump6      Fabricate and Deliver Heat Pump and Controls422      Install HVAC Ducts24      Insulate Ducts5      Set Heat Pump12      Relocate HVAC Chiller7      Startup and Test HVAC2      Install AC Grills and Registers5      Test and Balance HVAC Equipment2    Plumbing and Electrical258      Set Mechanical and Electrical Equipment36      Rough-In Plumbing/Piping3      Install Wiring and Cable36      Connect Equipment1  Exterior Finishes336    Close-In Phase Begins0    Building Enclosed0    Brick312      Assemble Brick Samples0      Review and Approve Brick Samples30      Prepare and Solicit Bids for Brick Exterior15      Review Bids for Brick15      Award Contract for Brick5      Deliver Brick1      Brick Exterior Walls17    Roof24      Insulation and Built-up Roofing24    Doors and Windows7      Install Door and Window Frames3      Install Exterior Doors and Windows5  Interior Finishes601    Drywall in Offices36    Touch-up and Clean-up2    Finishes Complete0    Punch List5    Building Addition Complete0    Plumbing and Lighting Fixtures44      Install Lighting Fixtures7      Install Plumbing Fixtures5    Floor and Carpeting581      Assemble and Submit Flooring Samples0      Review and Approve Flooring28      Prepare and Solicit Bids for Flooring24      Review Bids for Flooring15      Award Contract for Flooring5      Fabricate and Deliver Flooring279      Install Floor and Carpeting12    Carpentry59      Install Ceiling Grid36      Finish Carpentry and Millwork12    Paint12      Paint Building Interior12          

may be u need any assiatance u can catch up on me at my mail id

farnas.ap@gmail.com