Pipe productivity rate

Member for

13 years 8 months

i want to rate analysis of 2500mm dia pipe making with 20mm thickness Mild steel sheet. with material cost

Member for

18 years 3 months

Dear Anu,

The productivity depends upon the time cycle required for completing an activity.

time cycle depends upon, many factors,such as:

1.Diameter of Pipe.

2.Man power deployed

3.Equipemnt deployed.

4. Location and climateic conditions



you have given to little information in your querry.



At least mention the diameter of pipe.

cheers,

Abhi