This project involves implementing 4D planning techniques into ASC work flows in Western Australia trialled on Submarine HMAS Rankin. A detailed breakdown of the engineering 3d model linked to the work breakdown structure enabled a 4D visualisation of the maintenance programme for planned vs actual reporting, look ahead workshops, hazard identification and schedule health checks.