Engaged as a 4D Planning consultant for, I worked as part of the RCR Tomlinson tender team to develop a 4D Model for all structural mechanical and piping works of the processing plant modular installation.
The 4D process was utilised to optimise tender programme accuracy and validation of programme logic and methodology. The output was a 12 minute corporate tender video which formed part of the tender submission.