Hello
I have recently transited into planning from architecture and i am working on a multi story residential project. I have been asked to do a "Pod Schedule" for the flats as we are using prefab pod bathrooms. What is a pod schedule? does anyone know or has the installation sequence (for pod bathroom)? my email address is afecharles@gmail.com [1]. As i am from an architectural background, i am thinking it maybe like a typical door or window schedule but not sure.
Many thanks in advance.
Ade