Hi there, new user in need of a bit of help. I have set up a few Cost Centres which I would like to allocate to tasks. Asta seems to set these Cost Centres up with a value of £0.62 as standard. This means when I enter 100 into the allocation part of the task it defaults to 100 x £0.62 = £62.
When I change the Cost in the Cost Centre Properties highlighted in yellow below to £1 it automatically reverts back to £0.62. Does anyone know why it keeps reverting to £0.62 and how can I override it to let me change the cost value to £1?
Thanks in advance.