Here's a look at the physical % complete type in Microsoft Project as a more accurate way to monitor actual work accomplished from duration or work expended http://ed.gr/hqqx [1]
Here's a look at the physical % complete type in Microsoft Project as a more accurate way to monitor actual work accomplished from duration or work expended http://ed.gr/hqqx [1]
Links:
[1] http://ed.gr/hqqx
[2] http://www.planningplanet.com/forums/microsoft-project