When i checked the planned % by running the cost report i created the planned % is 2.91 but the scheduled % complete is only 2.26%.How can i rectify this?I verfied the planned % of 2.91 by checking the resource usage spreadsheet.
When i checked the planned % by running the cost report i created the planned % is 2.91 but the scheduled % complete is only 2.26%.How can i rectify this?I verfied the planned % of 2.91 by checking the resource usage spreadsheet.