A discipline is not a Product, a task is not an activity, a system is not a component, etc.
All the tree structures of projects are linked and you can see how here: http://3d-wbs.blogspot.fr/2014/05/part-103-3d-wbs-tree-structures.html [1]
A discipline is not a Product, a task is not an activity, a system is not a component, etc.
All the tree structures of projects are linked and you can see how here: http://3d-wbs.blogspot.fr/2014/05/part-103-3d-wbs-tree-structures.html [1]