Hi,
Anybody can tell me how to cast a column in top down construction after the higher floor slab casted?
Thanks.
Hi,
Anybody can tell me how to cast a column in top down construction after the higher floor slab casted?
Thanks.
Links:
[1] http://www.planningplanet.com/forums/group-forums/civil-engineering