Dear All,
I am presetly preparing Level 3 schedule for a EPC Project in Malaysia.I have to add the Local/Govt regulations and work permits required in to the schedule.As of now,I have only around 10 work permits listed in the schedule,which is very high level.
Does anyone know the detail work permit requiement and the sequence to be followed in the schedule preparation.
Thanks,
Kumar s