Hi!
I have a project ongoing with no resources assigned. On the construction part I've created an excel spreadsheet with different weights for different equipments installation to show the progress.
I have been asked to compare baseline S-curve with actual S-Curve with the wights from the excel sheet. I need to assign different percentage weights in PV to do that.
Can anyone share some advice?