Installation of Steel Structures, Cable Structures and Membrane Roof for Pfeifer Seil und Hebbe Technik at the Moses Mabhida 2010 FIFA world cup stadium.
Erection of Tensile Structures for MTT. Site survey. Selection and qualification of sub-contractors. Site establishment, civil works, utility supply, building work, rigging, equipment installation and site acceptance.