The S curves, the only way to measure the physical progress of a project.
- Create 26 S curves (baseline early and late, physical progress) in automatic connection with a MS PROJECT or PRIMAVERA P6 schedule.
- Spread the weights in a linear or Gaussian way over the tasks of schedule.
- Create S curves with 3 criteria, on the basis of 5 task codes.
- Manage a schedule up to 10,000 tasks.