I'm looking for a way to summarize the total slack of my project.
Does MSProject have a way to calculate average or net of my 200+ tasks total slack?
I'm looking for a way to summarize the total slack of my project.
Does MSProject have a way to calculate average or net of my 200+ tasks total slack?