START Date:
July, 2001 Planning Using Primavera P6 and TILOS.
Prepara Monthly reports, S-Curve , CIP Programe
Planning Using Primavera P6 and TILOS.
Prepara Monthly reports, S-Curve , CIP Programe
Links:
[1] http://www.planningplanet.com/taxonomy/term/4583
[2] http://www.planningplanet.com/category/project/major-civil-projects
[3] http://www.planningplanet.com/taxonomy/term/143
[4] http://www.planningplanet.com/category/industry/shipbuilding
[5] http://www.planningplanet.com/category/job-role/%E2%80%9Cplanning-engineer%E2%80%9D
[6] http://www.planningplanet.com/category/region/asia/singapore-assg