Dear all,
I wonder whether MS Project (I use 2007) has the following Excel like feature:
I want that I would setup several parameters (cells) and then when I change them, then some other parameters of tasks, resources etc would change depending on the parameters of these cells, based on certain formula
E.g. Say I have a lot of resources, which have specific hourly rates, but these hourly rates are dependent on a few other parameters (e.g. currency, country perceived risk etc). So, if I change these few parameters, then hourly rates of all resources are also changed, based on specific formula.