Dear Planners,
i am nearly to prepare comprehensive plan for the interior works and MEP(Mechanical,electrical,plumbing) for the Tower that we are building. structural works is ongoing and soon we will mobilize to start with the MEP work.
Currently i should plan the other activities and logics in exact order to control of MEP works and overlap them with others.
i have identified essential activities per floor which comprises everything:
removing props;
concrete repair works;
block works(masonry);
waterproofing;
MEP 1st fix;
MEP 2nd fix;
Walls plasted;
walls tiles;
painting;
raised floor;
floor tiles;
ceiling grids;
Fiber optic;
Doors and Windows;
install equipment(kitchen parts);
the question is that what is the best way to identify the logics between them?
Thank you in advance,
Ismayil