I am developing a schedule for about 100 miles of natural gas pipeline in Virginia, USA. Multiple spreads, one new compressor station, upgrade to an existing compressor station, one new metering station, many road crossings including crossing of a major interstate, minor water crossings. I am not sure at this point about the diameter of the pipe - figure 16".
What are the longest lead time materials that I need to plan ahead for on this project? Any other considerations? I am new to pipeline scheduling and any help would be greatly appreciated.
Thanks,
Rachel