I recently told that there is a International Construction Norm for the Civil Construction of a Steam Turbine Table but I find that almost impossble to believe since the designs and constructability vary based on the size of the proposed Stator Unit.
I am currently working on a 6 x 800 MW Power Station and wonder whether there are other individuals that have worked on a similar project so I may do a comparitive assessment to see if our current duration is similar.
Thanks