We have a Task called ROS (Required on site date)
Normally we apply a as late as possible constriant on this task,
The Task Predacessor is delivery to site
Task Successor is Construction with a Lag (The Theory being that we want everything on ste 2 to 6 weeks prior to use)
I have been advised that a ALAP constriant is not acceptable in a Court case so I am not allowed to use it.
Is this TRUE ?