Hi all,
What is the easiest way to assign the cost account?
Is it possible by excel or global change?
Thanks.
Hi all,
What is the easiest way to assign the cost account?
Is it possible by excel or global change?
Thanks.
Links:
[1] http://www.planningplanet.com/forums/oracle-primavera-pm6