Hi Guys,
I'm having a problem deleting projects inside primavera. Im using P6.2.1 Im deleting this because I want to create disk space inside the Data Base. the event code PRMDB-3725-4 keeps popping up everytime I try to delete existing projects and it even comes to the point that I cant even delete group of activities inside an existing programme. The event description is (PRM DBAccess Error: Database Server Error: Could not allocate space for object 'dbo.REFRDEL'_'refrdel_table_pk' in database pmdb$primavera' filegroup is full Create diskspace by deleting unneedeed files, dropping objects in the filegroup, adding additional files to the filegroup, or setting autogrowth on for existing files in the file group). I have gone inside the primavera sql server studio and tried to enlarge the existing database capacity which is 4096 mb but it is saying that the cummulative total should not exceed 4096 mb.I have one existing database inside the MSQL Server which is pmdb$primavera and when I select properties the size is 4105.94 and space available is 0.17mb .Is there any way I can delete existing project backdoor I mean not inside primavera so I can select specific projects to be deleted? Does anyone have an idea regarding this problem. I could not delete or add any project. Your help would be very much appreciated
Regards,
Glenn