In my project, there are quite a lot of provisional sum. It is assumed that the main contractor should have allowed time for these provisional sum in the contract. However, in fact, the contractors know little about the exact scope of these works. Do the contractor entilte for claim if it comes out that these provisional sum are very complicated finally.
Gary