Hi to all
I got an issue pertained to Design. Engineer/Consultant supposed to provide a 100 % Compatible Electrical Design with No objection clearance from statutory authority.But they [Engineer/Consultant]provided an tentative design during the project contractual period and electrical works based on tentative design are underway and major works are completed. Even after the contractual period they failed to provide 100 % Compatible Electrical Design with No objection clearance from statutory authority.There are few activities which is purely based on 100 % Compatible Electrical Design remains suspended.
How this scenario could be presented in TIA
Many Thanks
Shahul
I got an issue pertained to Design. Engineer/Consultant supposed to provide a 100 % Compatible Electrical Design with No objection clearance from statutory authority.But they [Engineer/Consultant]provided an tentative design during the project contractual period and electrical works based on tentative design are underway and major works are completed. Even after the contractual period they failed to provide 100 % Compatible Electrical Design with No objection clearance from statutory authority.There are few activities which is purely based on 100 % Compatible Electrical Design remains suspended.
How this scenario could be presented in TIA
Many Thanks
Shahul