Hi 2 all,
Please anybody can tell me that how to assign resource in all over activities.
I have at least 694 activities and i assigned resource as (manpower) but i want to assign same manpower to entire activities.
so can anybody tell me how to assign resource through Global change Option.
Thanks in advance........
Please anybody can tell me that how to assign resource in all over activities.
I have at least 694 activities and i assigned resource as (manpower) but i want to assign same manpower to entire activities.
so can anybody tell me how to assign resource through Global change Option.
Thanks in advance........