Hi,
Was wondering if there is a Practical way to cost load a schedule with:
1) Our selling price
and
2) Direct costs and contingencies,,, etc.
both at the same time on the same schedule and perhaps have a way to report the cost based on (any) or (both) of them.
Cheers,
Rami
Was wondering if there is a Practical way to cost load a schedule with:
1) Our selling price
and
2) Direct costs and contingencies,,, etc.
both at the same time on the same schedule and perhaps have a way to report the cost based on (any) or (both) of them.
Cheers,
Rami