What "resources" do you load in an Engineering, Procurement and Construction Level 3 Schedule? (for each one of those phases)
Where do you get that information from? (the "resources")
How do you "load" those resources in P3?
Once you have "loaded" those resources in your schedule, what is the output that you should generate? (what reports?)
Where do you get that information from? (the "resources")
How do you "load" those resources in P3?
Once you have "loaded" those resources in your schedule, what is the output that you should generate? (what reports?)