Dear All,
I am trying to use P6 resource curve at Engineering OBS. The aim is to distribute man-hours per discipline through the early dates given by primavera.
Does anyone have an idea of typical curve per discipline.
I assume the following:
PROCESS : plan man-hours distribution based on back loaded curve
Electrical, Instrumentation,Piping, Civil : plan man-hours distribution based on bell shaped curve.
To see the outlook of the curves, go to P6, menu, Enterprise, Resource curves.
Cheers,