When I explore the internet, I encountered Phantom Float term... Its not clear for me, but I want to develop my skills in planning...Pls help me...
When I develop a plan, my problem is how to minimize total float but maintaining the proper logic specially in high-rise building where the links between floors is not allowed. When I used resource leveling, it gives me stange result and I cannot control the activities itself... How to develop a baseline plan which is theoretically and contractually valid while maintaining it to be a workable program for the site people.
Pls. email me, thanks: francis_planning@yahoo.com [1]
When I develop a plan, my problem is how to minimize total float but maintaining the proper logic specially in high-rise building where the links between floors is not allowed. When I used resource leveling, it gives me stange result and I cannot control the activities itself... How to develop a baseline plan which is theoretically and contractually valid while maintaining it to be a workable program for the site people.
Pls. email me, thanks: francis_planning@yahoo.com [1]