Hi guys,
I am trying to analyze the multiple floats paths of diffrent activities in the schedule by selecting the Advance Option (F9) to cal. MFP...
No success, it schedules until 95 % and stops. No status / have to end session....Any suggestions on what the problem would be? For instance, in my case, the programmes final Activity is First Ore Shipped.... Just want to see the number of float paths.... To add to my confusion, when I F9 the same schedule in P6, no issues with the Multiple Float Path (MFP)????
Tks. in advance for any feedback....
I am trying to analyze the multiple floats paths of diffrent activities in the schedule by selecting the Advance Option (F9) to cal. MFP...
No success, it schedules until 95 % and stops. No status / have to end session....Any suggestions on what the problem would be? For instance, in my case, the programmes final Activity is First Ore Shipped.... Just want to see the number of float paths.... To add to my confusion, when I F9 the same schedule in P6, no issues with the Multiple Float Path (MFP)????
Tks. in advance for any feedback....