In P6 on my computer, summary bar always displays the duration in WORKING DAYS and not calender days. In my orgz. v have 5 day calender as global calender.
Is it possible to convert summary bar duration to calender days. Is it possible to have it by having a 7 day global calender with no off??
And by the way guys, what do u prefer to have summary bar durations, WORKING DAYS or CALENDER DAYS.
???