DEAR ALL,
ID LIKE TO KNOW THE MOST PRACTICAL METHOD TO CALCULATE THE TIME IMPACT.
SHOULD I USE THE APPROVED TIME SCHEDULE "PROGRAMME 14.1" OR THE UPDATED TIME SCHEDULE.
ALSO, WHEN THE CONTRACTOR INCREASE THE PRODUCTION RATES, WHICH PROGRAMME SHALL BE USED?