Hi,
I have an integrated Schedule with 9 WBS nodes. I am personally in charge of 7 of the WBS nodes, while 2 nodes are with the GC and a major equipment vendor. For those 2 WBS nodes, they turn in their weekly updates, and I import them. The schedule from the GC is causing a lot of problems since the GC is changing a whole slew of logic - some of them affecting the critical path. Now, when I import the schedule from the GC, the old links are not getting replaced with the new logic changes. The logic changes are also getting added on to the existing logic. This also creates some loops on my end. When I tried to select "Insert New" option in import, it is just inserting new logic ties, while still keeping the old ties in tact! Any help in this regards is very much appreciated. Thanks.
Raj
I have an integrated Schedule with 9 WBS nodes. I am personally in charge of 7 of the WBS nodes, while 2 nodes are with the GC and a major equipment vendor. For those 2 WBS nodes, they turn in their weekly updates, and I import them. The schedule from the GC is causing a lot of problems since the GC is changing a whole slew of logic - some of them affecting the critical path. Now, when I import the schedule from the GC, the old links are not getting replaced with the new logic changes. The logic changes are also getting added on to the existing logic. This also creates some loops on my end. When I tried to select "Insert New" option in import, it is just inserting new logic ties, while still keeping the old ties in tact! Any help in this regards is very much appreciated. Thanks.
Raj