Anybody can tell me
what is the overall manhrs/mt for Oil and Gas Platform. If possible manhrs/mt for structural, piping, electrical and instrumentation, piping, HVAC and architectural works.
and production rate for jackets, piles and conductors.
Thanks
-shaerah-