Dear Planners,
- During the preparation of the base line progam at the begining of the construction period of the project , Do we have to calculate the quantities for each activity based on the contract Bill Of Quantities or based on the quantities calaulated form the contract drawings.
- If there is defernces btween the quanties calculated from both soure(BOQ & Drawings) 15 % more or less and the client representative is insisting to fill the program with the quantities calculated from the contract drawings accordigly the total contract value will be inecreased / decreased by more than 15 % .
contractor refused to prepare the program base on the quantities calculated from the drawings based on the reason that the contract value in the agreement with the client was 100 milions and the contract period was 10 months( for exampe) so how the client can ask him to prepare and summit a program of works for 120 milion in the same peiod ( 10 months) .
- During the preparation of the base line progam at the begining of the construction period of the project , Do we have to calculate the quantities for each activity based on the contract Bill Of Quantities or based on the quantities calaulated form the contract drawings.
- If there is defernces btween the quanties calculated from both soure(BOQ & Drawings) 15 % more or less and the client representative is insisting to fill the program with the quantities calculated from the contract drawings accordigly the total contract value will be inecreased / decreased by more than 15 % .
contractor refused to prepare the program base on the quantities calculated from the drawings based on the reason that the contract value in the agreement with the client was 100 milions and the contract period was 10 months( for exampe) so how the client can ask him to prepare and summit a program of works for 120 milion in the same peiod ( 10 months) .