Hi Guyz,
Could anybody please give me a suggestion on how i am going to divide my activities into WBS, im doing a terminal building right now and im struggling hard to present my schedule into WBS, the size of the terminal is 68m x 48m, communication bldg is 15m x 12m, the bldg composed of toilet, offices, 580 sitting, mechanical, electrical etc.etc. just an idea, by the way i am Mechancial Engineer by profession but assigned to do the schedule of civil works, or maybe someone out there is willing to share their works in terminal building.
Thanks
mrureeck@yahoo.com [1]
Could anybody please give me a suggestion on how i am going to divide my activities into WBS, im doing a terminal building right now and im struggling hard to present my schedule into WBS, the size of the terminal is 68m x 48m, communication bldg is 15m x 12m, the bldg composed of toilet, offices, 580 sitting, mechanical, electrical etc.etc. just an idea, by the way i am Mechancial Engineer by profession but assigned to do the schedule of civil works, or maybe someone out there is willing to share their works in terminal building.
Thanks
mrureeck@yahoo.com [1]