Can P3 Calculate the total float while scheduling , taking into consideration the manpower leveling?
In other words can i affect the total float shown on the program by Manpower leveling?
The logic says that Non time constrained manpower levelling would affect the project completion should the manpower is not sufficient; how can i reflect that on the total float? it is easier to other people to understand it if the float changes...is it possible?...any advise?
In other words can i affect the total float shown on the program by Manpower leveling?
The logic says that Non time constrained manpower levelling would affect the project completion should the manpower is not sufficient; how can i reflect that on the total float? it is easier to other people to understand it if the float changes...is it possible?...any advise?