hi,
in a lump sum contract,if only the material specification of an original BOQ item is changed(eg instead of bitumen painting cementitious waterproofing is instructed)is it required to remeasure the whole item even if there is no change in the scope quantity wise??? plz throw some light with reference to FIDIC.
in a lump sum contract,if only the material specification of an original BOQ item is changed(eg instead of bitumen painting cementitious waterproofing is instructed)is it required to remeasure the whole item even if there is no change in the scope quantity wise??? plz throw some light with reference to FIDIC.