hi all,
can a Contractor request the Engineer to consider a variation under clause 51.1 d (FIDIC)due to change in the size of tiles which is a PC rate item in case of a lumpsum contract & re-measure the same as per cl 55 & 56.
thanks in advance
sam
can a Contractor request the Engineer to consider a variation under clause 51.1 d (FIDIC)due to change in the size of tiles which is a PC rate item in case of a lumpsum contract & re-measure the same as per cl 55 & 56.
thanks in advance
sam