I am doing a small project with MS Project and while I am entering the duration, e.g. I enter 12 days, it became 12.25 or 11.75 it can not be 12, how to delete this decimal, even though I checked the calendar.
Thanks
Moutaz
Thanks
Moutaz
Links:
[1] http://www.planningplanet.com/forums/microsoft-project