Hi,
Im developing a construction schedule for 50 storeys building with 5 basements. The site is 2,800 m2 and located in town centre.
Since the site is small and we are facing space constraints, the consultants have decided to go for top-down construction system. In this system, basment and upper floor works will start simultaneously.
Does anybody have experienced on top-down construction system? What is the work sequence? Please advise.
Regards.