a) why the planner prefer WBS instead of categorizing the project in activities codes under head of area , responsibility , item etc.
Is it compulsory that we always use WBS instead of using project codes.
b) What does the structure means as 2,2 in wbs?
Level 1 2 3 4
structure 2 2 2 2
Is it compulsory that we always use WBS instead of using project codes.
b) What does the structure means as 2,2 in wbs?
Level 1 2 3 4
structure 2 2 2 2