hi everybody,
i am in organization which deals in designing Pipeline works to the tune 100 mm to 4000 mm FRP Pipes. if anybody having PEtrochemical or Sewage Pipeline Experience Pls provide me the Production Rates and Manpower required for it.
Thanks,
feroze
i am in organization which deals in designing Pipeline works to the tune 100 mm to 4000 mm FRP Pipes. if anybody having PEtrochemical or Sewage Pipeline Experience Pls provide me the Production Rates and Manpower required for it.
Thanks,
feroze