Hello,
I want to document 3 parallel projects with their own tasks.
And subdivide the 3 groups of tasks, then put a 1-line heading on-top of each group of tasks. So this will just be a text label and shouldnt have a corresponding GANNT chart entry.
Is this possible?
Thanks,
Bob.
I want to document 3 parallel projects with their own tasks.
And subdivide the 3 groups of tasks, then put a 1-line heading on-top of each group of tasks. So this will just be a text label and shouldnt have a corresponding GANNT chart entry.
Is this possible?
Thanks,
Bob.