I have to link P3 to Ms Project.
But as P3 will be used at more high management level, and Project by the section engineer to product a detail level construction programme, I have to go through excel.
We use P3 for network, so it look like the Pervasive software for P3 is not working.
But after I have the file in excel I can import in P3.
So I would like to have a dynamic link between Project and excel, that will assure that the excel file will be update every time the project programme will be.
Can anyone help me to set up this dynamic link?
Thanks
PS. We have this situation, because fo we do not have licence of P3 also for the section engineer.
But as P3 will be used at more high management level, and Project by the section engineer to product a detail level construction programme, I have to go through excel.
We use P3 for network, so it look like the Pervasive software for P3 is not working.
But after I have the file in excel I can import in P3.
So I would like to have a dynamic link between Project and excel, that will assure that the excel file will be update every time the project programme will be.
Can anyone help me to set up this dynamic link?
Thanks
PS. We have this situation, because fo we do not have licence of P3 also for the section engineer.