Hi,
With MSProjectXP, we cannot specify a project duration of greater than 100%. But what if a project extends beyond the expected duration? How can we show this project was extended in MSProjectXP?
Thanks,
IT_Student
With MSProjectXP, we cannot specify a project duration of greater than 100%. But what if a project extends beyond the expected duration? How can we show this project was extended in MSProjectXP?
Thanks,
IT_Student