Hello everybody,
I use in my schedules the "interruptable" option in scheduling.
I find it more representative of the logic, especially when I use the SS and FF relationships. (This will show a bar longer than the duration of the activity).
Consultants do not like.
What do you think about that, and do you think Consultants can impose the "contiguous" option on the Contractor?
Joe