Is it possible to Create two S-curves on one spread sheet,
The X-axis representing Time/Duration
The Y-axis representing Worls complete to date.
The two s-curves representing: Earliset Start and Latest Finish respectively, thus creating a range to be within to maintain programme.
Being outside the range, representing being ahead or behind
the programme.
Is this possible to 2, and F it is possible, can you let me have a step-by-step, idiots guide on how-to????
Please help,
Sincerly,
Concerned.